Skip to content

What are you looking for?


You may also like

1MRK002239-BA ABB Power Supply Module1MRK002239-BA ABB Power Supply Module1MRK002239-BA ABB Power Supply Module
1MRK002239-BA ABB Power Supply Module
1MRK002239-BA ABB Power Supply Module
1MRK002239-BA ABB Power Supply Module

1MRK002239-BA ABB Power Supply Module


Only 10 left - Selling fast

PRODUCT SKU : 1MRK002239-BA

PRODUCT TYPE : Power Supply Modules

PRODUCT VENDOR : ABB


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The ABB 1MRK002239-BA, also cataloged as the 1MRK002239-BA Power Supply Module, operates as a dedicated hardware component for auxiliary DC power conversion and regulated voltage distribution within ABB Relion and protective relay control networks. The board conditions input supply voltage to deliver a regulated 2.5 A DC output to backplane sub-assemblies and control circuits.

Hardware Specifications

Parameter Specification
Model 1MRK002239-BA
Brand ABB
Origin Global Manufacturing Facilities
Weight 0.5 kg
Dimensions 176 mm x 110 mm x 70 mm
Operating Temp -25 deg C to +55 deg C
Power Consumption Self-dissipation calculated from operational thermal loss
Output Current 2.5 A DC max
Mounting Type DIN-rail mounting
System Compatibility ABB RET5xx, RED5xx, RES5xx, and REx670 series

I/O Density Scaling & Firmware Flash Compatibility

The 1MRK002239-BA power supply module stabilizes DC power rails to maintain backplane bus communication velocity across high-density protection relay configurations. By delivering steady output current under line voltage variation, the module prevents logic resets during transient grid disturbance events. This power bus stability supports I/O density scaling and uncorrupted firmware flash compatibility during CPU boot cycles and real-time fault recording routines.

Frequently Asked Questions

Q: What protection relay architectures natively interface with the 1MRK002239-BA power supply module?

A: The module is hardware-compatible with ABB RET5xx, RED5xx, RES5xx, and REx670 series protection platforms.

Q: What is the maximum output current rating for this module?

A: The module supplies a maximum continuous DC output current of 2.5 A to internal backplane and control circuitry.

Q: Can the 1MRK002239-BA module be hot-swapped during live operation?

A: Input supply power must be isolated and secondary filter capacitors fully discharged before module removal to prevent electrical arcing across backplane pins.

Field Installation Guidelines

Follow these technical procedures during panel installation and enclosure mounting:

  1. Electrical Isolation: De-energize and lock out incoming supply power. Verify zero voltage using a calibrated multimeter prior to touching terminal connections.
  2. Electrostatic Discharge Handling: Wear a grounded ESD wrist strap when unboxing and positioning the unit to prevent static damage to internal logic circuits.
  3. Mechanical Mounting: Snap the module securely onto standard DIN-rail mounting tracks inside the cabinet, verifying that spring clips lock fully into place.
  4. Terminal Wiring and Earthing: Route supply conductors through field terminal blocks, torque screws to specified tightness, and verify low-resistance protective earth continuity to the cabinet ground bus.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more