Skip to content

What are you looking for?


You may also like

4000103-516 Triconex Cable Assembly4000103-516 Triconex Cable Assembly4000103-516 Triconex Cable Assembly
4000103-516 Triconex Cable Assembly
4000103-516 Triconex Cable Assembly
4000103-516 Triconex Cable Assembly

4000103-516 Triconex Cable Assembly


Only 10 left - Selling fast

PRODUCT SKU : 4000103-516

PRODUCT TYPE : System Cables

PRODUCT VENDOR : Triconex


  • 100% Genuine Parts – Risk-Free 30-Day Returns
  • 1-Year Warranty & Expert Support for Every Order

Product Details

The Triconex 4000103-516, also cataloged as the 4000103 Cable Assembly, operates as a dedicated hardware component for high-integrity signal interconnection and system backplane extension within Tricon CX platforms. It routes high-speed data communications and 24 VDC auxiliary power across chassis racks, supporting fault-tolerant peer-to-peer networking and sequence of events (SOE) timestamp synchronization.

Hardware Specifications

Parameter Specification
Model 4000103-516
Brand Triconex (Invensys / Schneider Electric)
Origin USA
Dimensions 100 mm x 50 mm x 10 mm
Operating Temp -40 deg C to +85 deg C
Power Consumption Operating Voltage: 24 VDC
Cable Length 10 feet (approx. 3 meters)
Protocol Support Modbus TCP/IP pass-through / peer-to-peer
System Compatibility Tricon CX Safety Instrumented Systems

Triple Modular Redundancy (TMR) 2oo3 Architecture and Fail-Safe State Execution

The Triconex 4000103-516 cable assembly provides redundant conductor paths required to maintain triple modular redundancy (TMR) 2oo3 architecture across distributed I/O racks. Galvanic isolation and shielded differential pair grouping prevent external noise coupling from interfering with 1 ms SOE event timestamping or board-level voting algorithms. By preserving physical bus continuity under hardware fault conditions, the cable infrastructure enables uninterrupted fail-safe state execution and maintains SIL3 system compliance across all connected chassis nodes.

Frequently Asked Questions

Q: Does the 4000103-516 cable assembly support hot-swap maintenance procedures on connected I/O racks?

A: Yes, in a redundant dual-cable bus topology, individual cable assemblies can be disconnected and replaced online without interrupting system backplane power or halting active processor operations.

Q: How does the cable construction prevent electromagnetic interference across long parallel runs?

A: The assembly incorporates overall foil and braided shield layers around internal twisted pairs, providing physical galvanic isolation against high-voltage transient coupling in cabinet wireways.

Q: What input voltage level is maintained through the internal power conductors of the assembly?

A: The internal power leads are rated to carry regulated 24 VDC system power across backplane sub-assemblies over the standard 10-foot cable length.

Field Installation Guidelines

  • Inspect the connector pins and locking screws of the 4000103-516 cable assembly for physical damage prior to insertion into the chassis interface port.
  • Align the cable connector with the mating chassis receptacle and hand-tighten the retaining thumbscrews evenly to guarantee proper pin seating.
  • Maintain a minimum bending radius of 50 mm along the cable run to prevent conductor fatigue and signal impedance mismatches.
  • Bond cable shield drain wires directly to the cabinet instrumentation earth bar at both panel termination points to ensure maximum noise immunity.

Additional Information

  • 100% Genuine Parts: All products are original and authentic, ensuring reliable industrial performance.
  • 30-Day Refund Guarantee: Return any in-stock item within 30 days in original, unopened packaging for a full refund (excluding shipping and fees).
  • 12-Month Warranty: Covers defects in materials or workmanship; excludes misuse, normal wear, or unauthorized modifications.
  • Worldwide Shipping: We ship via USPS, UPS, FedEx, and DHL. Delivery times vary by country and may be subject to customs or import fees.
  • Support & Contact: Technical and warranty assistance is available anytime. Contact us here: Contact.
  • Purchase Guidance: Check product specifications and compatibility carefully before ordering to ensure proper application.




Recently Viewed Products

Tech & Buying Guide

Technical Insights, Installation Guides, and Buying Tips
Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling Cabinet Preventive Maintenance: Essential Healthiness Checks for PLC, DCS, and ESD Systems

Marshalling cabinets serve as the vital interface between field instrumentation and control room electronics in modern process facilities. Regular preventive maintenance of these cabinets ensures signal integrity across programmable logic controllers (PLCs), distributed control systems (DCS), and emergency shutdown (ESD) networks. System technicians must execute structured inspection protocols to mitigate environmental risks, identify loose wiring, and maintain continuous operational readiness.

Read more
Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Spatial Computing in Industrial Automation: Elevating PLC and DCS Operations with AR and VR

Industry 4.0 integrates digital intelligence into field operations, transforming factory automation landscapes worldwide. Spatial technologies—specifically Augmented Reality (AR) and Virtual Reality (VR)—redefine how engineers interact with industrial control systems. By bridging computer-generated CAD models with real-time operational technology (OT) data, immersive displays enable intuitive monitoring, rapid diagnostics, and safer maintenance across complex processing facilities.

Read more
Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Master Acceptance Testing: Understanding FAT and SAT in Industrial Control Systems

Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) serve as critical quality assurance gateways in complex industrial control systems. Both procedures verify that programmable logic controllers (PLCs), distributed control systems (DCS), and associated field devices meet strict functional specifications. However, executing these tests effectively requires clear delineation between off-site staging and final field commissioning.

Read more